50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

Answer Posted / Satya Pal

To calculate the required dredging depth, we first need to determine the total volume of earth that needs to be removed and then divide it by the area of the dredging site. Here's the calculation:n
1. Calculate the total volume of earth needed: 50 acres * (43,560 square feet/acre) = 2,178,400 square feet
2. Assume the average density of soil is approximately 100 pounds per cubic foot (pcf). Convert the area to cubic feet: 500 ft * 200 ft = 100,000 square feet * 144 sq ft/cubic foot = 14,400,000 cubic feet
3. Calculate the required dredging depth: Total volume needed / Dredging area = 2,178,400 cu ft / 14,400,000 cu ft = 0.153 feet or approximately 1.83 feet (rounded to the nearest foot).

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1672


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2063


please send me bhel questions on rupesh.017@rediffmail.com

2797


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2242


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1923


Technical Question of Civil Engineering

2358


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5529


What is Density of cement, sand & aggregate ?

1615


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2546


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2493


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2510


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2594


VAT and CST ? Which benefits for buyer ? Why benefits?

1905


HOw much % of premium on DSR-2013 currently

2051