Answer Posted / Amrinder Kumar
Shuttering is used in reinforced concrete slabs to form and support the wet concrete during curing. The process involves creating a mold or formwork using shuttering materials, which can be made of wood, steel, or other materials. After pouring the concrete, the shuttering is removed once the concrete has achieved sufficient strength.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the per cu. mt. price of ready mix in Gujarat region.?
how can we calculate steel value, depending on load
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
please send me bhel questions on rupesh.017@rediffmail.com
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
HOw much % of premium on DSR-2013 currently
what is the 0 value in quantity surveying
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
plz.show development and anchorage length in simple diagram.