20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Answer Posted / Savita Gupta
To calculate the total volume (V) of materials required for a 20mm sand-face plaster on walls consisting of 12mm backing coat of 1:3 cement mortar and an 8mm finished coat of 1:1 cement mortar, including scaffolding, watering, finishing etc., you can use the following steps:
1. Calculate the volume (Vb) of the 12mm backing coat:
- Area (Ab) of a wall section in square meters (m²): A = length x width
- Volume of the backing coat per unit area (Vbc_unit) = 12 mm / (3 * (1 + 0.4)) = Vbc_unit (approximately 3.75mm/m²)
- Total volume (Vb) of the backing coat = Ab x Vbc_unit
2. Calculate the volume (Vf) of the 8mm finished coat:
- Volume of the finished coat per unit area (Vfc_unit) = 8 mm / (1 + 0.4) = Vfc_unit (approximately 7.33mm/m²)
- Total volume (Vf) of the finished coat = Ab x Vfc_unit
3. Calculate the volume (Vs) of the sand-face plaster:
- Volume of sand-face plaster per unit area (Vsp_unit) = 20 mm / (3 * (1 + 0.4)) = Vsp_unit (approximately 6.67mm/m²)
- Total volume (Vs) of the sand-face plaster = Ab x Vsp_unit
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
VAT and CST ? Which benefits for buyer ? Why benefits?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
what is the 0 value in quantity surveying
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
HOw much % of premium on DSR-2013 currently
plz.show development and anchorage length in simple diagram.
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?