adspace


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of
Ground Level Reservoir

Answer Posted / Vishal Kumar Rai

To calculate the amount of cement required for RR masonry with a mix ratio of 1:8 and used in the foundation of a ground-level reservoir, you can follow these steps: 1) Determine the volume of the foundation. 2) Calculate the volume of cement blocks and mortar separately. 3) Add the two volumes to find the total cement requirement.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2264


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2600


material used for mendrel use to bend epoxy coated rebar

2245


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2493


Why do you want to work here

2451


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2241


pls mail some more tecnical qustions at msaranya2610@gmail.com

2181


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2510


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1898


what is the difference between replacement of cement by groundnut shell ash

3306


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

3226


how can we calculate steel value, depending on load

2441


please send me bhel questions on rupesh.017@rediffmail.com

2797