Designing a quarter-turn staircase for a 3m floor-to-floor height involves several factors such as tread depth, riser height, and handrail requirements. Here's a basic diagram to illustrate the concept:
/
/
/
/
________
| Tread |
|________|
| Riser |
|________|
In this example, the riser height would be around 18-20 cm (to meet common recommendations for comfortable stair climbing), and the tread depth should be about 24-26 cm. The specific dimensions may need to be adjusted based on local regulations and design guidelines.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can i get civil engineering test papers.......?????
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What is Density of cement, sand & aggregate ?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Why do you want to work here
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
I need to constructive work in amaraj batteries
what is the difference between replacement of cement by groundnut shell ash
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
400 ku d/c clearess ketan hota hai?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now