whaat is blister in box girder bridge and what is its function..

Answer Posted / Navaneet Kumar

Blister in box girder bridge refers to a localized defect or damage that occurs on the concrete surface of the deck. It appears as a raised, bubble-like area due to the buildup of air or moisture beneath the concrete surface. The primary function of a box girder bridge is to support the load and transfer it from one side to another while providing clearance for the passage of vehicles or other traffic. In the context of blisters, they can compromise the structural integrity and durability of the bridge if not properly addressed.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2365


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2264


HOw much % of premium on DSR-2013 currently

2051


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2546


pls mail some more tecnical qustions at msaranya2610@gmail.com

2183


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

2236


Why do you want to work here

2451


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5529


water leak detection system question & answer

2527


how can we calculate steel value, depending on load

2444


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

2226


material used for mendrel use to bend epoxy coated rebar

2246


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2594


what is the 0 value in quantity surveying

2480