adspace
how to estimate material requirement for an area of house in
square feet?
Answer Posted / Manoj Chauhan
Estimating material requirements for a house can be complex and depends on many factors such as the type and size of the house, the materials used, and local building codes. A common method is to use a per-square-foot estimate based on average values for each material. For example, you might find that drywall requires about 0.75 square feet per cubic foot, while roofing shingles require about 3 squares per 100 square feet.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
I need to constructive work in amaraj batteries
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
please send me bhel questions on rupesh.017@rediffmail.com
can i get civil engineering test papers.......?????
pls mail some more tecnical qustions at msaranya2610@gmail.com
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
water leak detection system question & answer
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
Why do you want to work here