If we have the center line of the Finnish road level and we
want to know what level of pay would have offset the Lhs
and Rhus RHS 1,2.5,5 1,2.5,5 m.
Answer Posted / Rahul Sirohi
To find the level of pay that would offset the Left-Hand Side (LHS) points in a Finnish road, you would need to know the slope of the road and use the point-slope form of a linear equation. Given LHS points (1, 2.5, 5) and RHS points at the same vertical line, we can find the slope (m) using the formula m = (y2 - y1) / (x2 - x1). Once you have the slope and the coordinates of a point on the right side (RHS), you can use the equation y = mx + b to find the pay level (b) that would offset the LHS points.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
I need to constructive work in amaraj batteries
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
Why do you want to work here
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
pls mail some more tecnical qustions at msaranya2610@gmail.com
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
400 ku d/c clearess ketan hota hai?
what is the 0 value in quantity surveying
please send me bhel questions on rupesh.017@rediffmail.com
Technical Question of Civil Engineering
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.