i. Slump cone is to be filled in……………………..Layers.

Answer Posted / Aesha Varshney

i. The slump cone is to be filled in layers.nii. Slump cone is not measured by cylinder or cube because it allows for better evaluation of the fluidity and workability of freshly mixed concrete, which cannot be accurately assessed with a rigid mold like a cylinder or cube.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3239


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2493


I need to constructive work in amaraj batteries

1939


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2063


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


can i get civil engineering test papers.......?????

2550


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2240


HOw much % of premium on DSR-2013 currently

2051


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2510


how can we calculate steel value, depending on load

2444


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2425


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2546


what is the difference between replacement of cement by groundnut shell ash

3308


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1898