Suppose you planning to paint newly fabricated workshop
building made of structural steel of 10 tons total mass.
How many litters paint primer for 1 coat and 2 coat of top
coat?

Answer Posted / Gaurav Wadhawan

To determine the amount of paint required for a workshop building, we need to know the surface area of the structure. However, since the question mentions a steel structure without providing details about its size or specific shapes, it's impossible to provide an accurate calculation.

Typically, for industrial painting projects like workshops, you would use a combination of primer and topcoat paint. The coverage rates for each coat can vary depending on the brand and quality of the paint. For example:

- Primer: 10-20 square meters per liter
- Topcoat: 5-15 square meters per liter

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which is the latest version of solidsworks?

1343


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

2226


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1923


pls mail some more tecnical qustions at msaranya2610@gmail.com

2181


What is Density of cement, sand & aggregate ?

1612


water leak detection system question & answer

2526


please send me bhel questions on rupesh.017@rediffmail.com

2797


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1670


VAT and CST ? Which benefits for buyer ? Why benefits?

1902


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5529


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2594


What is the per cu. mt. price of ready mix in Gujarat region.?

2429


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2510


material used for mendrel use to bend epoxy coated rebar

2245