adspace


what is the meaning of 40/20 src

Answer Posted / Sanjeev Singh Tomar

In civil engineering, '40/20 src' often refers to a fire resistance rating system. The numbers indicate the hours of fire resistance for a given material. In this case, '40' means the material can withstand fire for 40 minutes, and '20 src' indicates it was tested according to a specific standard (BS 476 Part 20 in the UK). However, without more context, this is just an educated guess.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the strength of 1:6:12 mix?

3159


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3236


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2593


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2232


please send me bhel questions on rupesh.017@rediffmail.com

2797


What is Density of cement, sand & aggregate ?

1610


what is the 0 value in quantity surveying

2478


HOw much % of premium on DSR-2013 currently

2048


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1921


I need to constructive work in amaraj batteries

1939


material used for mendrel use to bend epoxy coated rebar

2245


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2211


Why do you want to work here

2451


pls mail some more tecnical qustions at msaranya2610@gmail.com

2179