1)What is the total volume of aggregates required for
1cu.mtr.solid hard concrete?
2)What is total mass of wet concrte and dry concrete after
28 days of M25?
3) Is 28 days strength is the final strength of concrete or
it gets increasing as the time period increses.?
4)What is the volumetric proportion of concrete grade of
M25.M30,M35,M40
Answer Posted / anmol
1:1:2
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
why the openings of sieves are square io size?
Explain what are the phases inspections are done by local authority while construction?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
what is the water-cement ratio of mix design while 30mpa in 7 days?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what r the precaution for high in atp tempareture,low in atp tempareture
what are the code used for residental building?
Moisture content calculation for diff mix ratio's ??
why we are useing plastic under the lean concrete?and whts the advantage?