Answer Posted / kriti raj
The bridge that's length is more than 6 m and less than 60 m is known as Minnor bridge. And the bridge that's length is more than 60 m is called major bridge.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how to shuttering is used in slab
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
how much shouid be the rate for ready mix concrete per cubic meter
Rate analysis of Vitrified tile in cement mortor 1:3
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
What is need for setting limits?
how to calculate mivan shuttering matrial
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
Why are pull-out tests performed for soil nails?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
how can calculate cutting length of diamond ring
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3