Answer Posted / saquib hassan
This test is done to determine the initial and final setting times of cement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
what is idealized curve for concrere and steel
What is difference between engineering stress and true stress?
What does a construction cost covers and what does not?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Define current ucs?
In cement concrete how to check a quality of material also proportion of material at site ?
Explain the various stages of the project planning process in construction?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Explain the advantages and disadvantages of using plastic and timber fenders?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
how meny typs of renging rod?
Forces in a Shear Wall are in plane or out of plane ?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.