Answer Posted / vivekanand
1.Conducting tests and documentation on all materials
2. NCR and confirmaty reports
3.Calibrations of all equipment , plant & machinery
4. Workmanship
5..Checking geometry of the building
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
how to determine H- zone in a column? where it will occur?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How to activate isometric axes in cad?
what is the water cement ratio for plastering
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
what is civil all interview questions
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
how much to get of BRC lapping in full yield and half yield ?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
For what purpose bedding is used under storm water drains?
How to calculate woden area in sft and Cft
1m square 20mm plastering how much of water need curing work
what is raft foundation
Describe the various methods of concrete curing?