Answer Posted / vivekanand
1.Conducting tests and documentation on all materials
2. NCR and confirmaty reports
3.Calibrations of all equipment , plant & machinery
4. Workmanship
5..Checking geometry of the building
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
2. What are the advantages of your present job, things you like about it?
How do you maintain water pressure?
What is the difference between Hinged and pinned in Column ends
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
what are the challenges of being a team leader and a supervisor?
how many time use of plywood shuttering and IS code
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is the distance between railway tracks?
If specific gravity of cement is less than 3.15 what is the cause?