what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
Answer Posted / sainath
IS2502 (1963)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Define aligned dimension?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
whats is difference between anchorage length and development length
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
How foundation is designed, Column design and beam design
What will you do if a portion of load bearing wall collapses under your supervision?
Basic questions of civil engineering
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
What tor stands for in tor steel?
How to find out slope footing concrete
construction workers how much time take one work or qty
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?