Answer Posted / madhusudhan
1+1+2=4
1/4=0.25x1440=360kg
Or 7.2bags per m³
For 1m³wet concrete you required 1.54x360kg=554.4kg cement
Or 11.088 bags
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the most suitable foundation when construct a bird watching tower in a marshy land
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
How to do bbs in excel format
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
mix design procedure for 1:6 cement mortar
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
what post do you prefer to work in this company and why do you think you can serve better in such position?
how to identify the failure of building by expansive soils
How do you compute volume of airflow?
How to calculate canal slope curvature qty!
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
Civil engineering material testing Standard results
Discuss some applications of modular elasticity?
What is rolling stock
which method is used in semi-rigid connection design??