what is difference of NP3 and NP4 pipe and what is the
thickness of 1000mm dia NP4 pipe
Answer Posted / jaya kumar
Hume pipes are available in three grades NP2, NP3, and NP4. The major difference between NP2, NP3, and NP4 RCC pipes is the load-bearing quality and flow. NP 2 RCC pipes are used for low duty load, NP 3 RCC pipes are used for medium-duty load, and NP 4 RCC pipes are used for heavy-duty load.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why the openings of sieves are square io size?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
Define What is the force exerted by the Tacoma narrows bridge?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
How to fix toll charge for a particular vehicle at toll booths in a highway?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How to do base isolation using ETABS software?
What is the largest concrete dam in the world?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how to convert cement, sand aggregate quantity from M3 to kg with full description?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Explain the latest method to detect a crack in a building?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).