Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How many types of fault occur in a 3-phase power system?

Answer Posted / maruth sk

Two types of faults:
Upstream and downstream..

Upstream faults are such as over voltage, under voltage, low/high frequency, Buchholz, OTI, WTI, PRD, OSR

Downstream faults are over current, Earth fault

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is current check gurd relay?

2598


what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.

2208


how ceiling fan worked?

1920


hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com

1788


how a flip flop can be used as a latch?

1996


I would like to know that the fault curretn at base load and at 10% generation will be same? Fault level of BUS remain same with different generation?

1868


what about GD square and its important for motor design?

3824


What are gain margin and phase margin?

1394


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7699


Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT

2589


Do u know any one? how to find out in motor rated amps? formula?

2033


i am an maintenance engineer. one distribution board have 5 feeder. recently its ELR trips frequently, but it take some times after trip( 10min,20min..)but 3 feeder no load. two feeder only loaded. i checked one feeder IR value all values are above 50Mohm.but B phase to Earth is only 9Mohm.any problem about low value

1951


After synchronization with grid what is the demand value QKVAR and how we will maintain that?

2273


What about electrical Units. discrive in detail

2097


what is the common earth

1089