Answer Posted / maruth sk
Earth fault,
Short circuit,
Over current,
Over voltage
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I want the details about BHEL company examination.Can anyone able to help me please.
hello! sir i did three year of diploma in electrical (2007- 2010) and now i m a student of electrical engineering. sir can i apply for germany visa for study and part tome work over there?
Write the analogous electrical elements in force current analogy for the elements of mechanical translational system.
In India the supply voltage is 230 volt A.C. During the negative half cycle phase becomes neutral and neutral become phase? or what will happen during negative half cycle? how the electrons flow during positive and negative half cycle?
What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?
1.Z transform always lies around ? a) origin b) pole c) zero d) z=1. Multiples Mcqs which is bother me can’t find answers on internet. Some help required with little explanation . Note: this is not homework or related to any test. Thanks
What is resistance reading of earth copper rod with grid and without grid?
why we can stote dc? why we cant store ac?
Explain with example of functional requirements of protection relay in terms reliability, selectivity, sensitivity
what is the formula of starting current of 3phase and 1 phase motor???
Why do we mostly prefer to generate and distribute electricity in 3 phase and not in 4 phase or 5 phase?
what is formula to cal cute earth pit numbers and size of earth strip used in earthing?
i am trying to PSUs/govermeant jobs since last 2 years but still i m not success, plz help me.
How can we calculate the efficiency of a Running (On-Load) Motor ? What parameters are required and what is the method ?
What is the unit audit? if our Max demand is something and we found much more unit then how to improve our max demand?