I am applied 100 % pressure on to the air to open control valve,but the valve is not fully closed..and 10-15% is open the valve. how to calibrate the control valve?
Answer Posted / ajay
First the question is not correct. for air to open if given 100% air, then valve should be fully open, not close ...clear your question
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75
The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is:
WARNING: Could not connect to equalize destination. (7001)
Retrying. Number of retries = 0/1
ERROR: LdXopsLoadMain: connect error 10060
ERROR: Processing terminated due to connection error. (7002)
Equalization end with errors. STN0149
---- ERROR = 2 WARNING = 1 ----
Background:
>Updated the ExaOPC software on the STN from 3.60 to 3.75
>STN operating system is Windows Server 2008 R2
>HIS operating system is Windows Server 2016 Stanard
Solutions attempted include:
>Ensuring all IP addresses are correct and all networked devices can be pinged.
>The ability to ping a device using its host name from another device (
why any measurement made interms of pressure is more accurate ? to be more precise most of the flow velocity is made interms of pressure and it is accurate. what is the reason behind pressure measurement being accurate ?
How digital input and digital output 's are working in dcs
typical loop drawing of a simple feedback control comprising of one transmitter and one control
What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.
Coal mill Instruments Equipments for cement plant And process diagram ?
How process line mpm calculation is done?
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
How does a single acting, spring return ball valve actually work? Does it require continuous air supply?
Where is wet leg is used?
what can of fault ofently come in vibration mesurement?
Explain the mechanism behind the turbine meter.
when a magnet is heated?
How to calibrate radar type level transmitter for interface level? Total liquid(liq.1 and liq.2), level both the liq individually? For. Both the liquid levels how the signal will go from transmitter to dcs? How to calibrate. Single radar 9:26:55 AM for 2 different liquids in a tank?
hi,i am doing 3 year in electronic and instrumentation engineering. what type of aptitude questions will be asked in a core industries and how can i improve my skills in instrumentation?