Define What is an ice dam sock?
what do you know that m20,m25
please briefly explain calculating or estimating steel quantity for a RCC column?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
how much used soil in 1 brick of standard size?
significance of specific surface area of particles?
how i can tak Quantity of mortar in block work
What is the use of offset command?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
what is floating slab foundation?
What are the applications of cad?
what are the changes in concrete pour height as per IS 456, 2009?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering