1) 1m+1mh=10m2 blockwork per day
2)1m+1mh shuttering=around 5m2 per day
3)1m+1mh barbending=around 200kgs per day , inc cutting,bending,placing.

Is This Answer Correct ?    11 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the coefficient for running feet to cft coversion both area and price

1926


What is construction mitigation management?

1835


What out turn civil works

6349


how many running meters in one kilogram of 4mm pvc coated chainlink fencing

639


Define angular dimension?

668






how to caluclate sienerge qty in construction in ap

1939


Define What does civil status mean?

750


What is the cost difference between site mix and ready mix concrete per cubic meter

1441


Define mirror?

797


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1577


how can calculate cutting length of diamond ring

1367


What is unit weight of normal concrete?

674


What is Refuse Area In High Rise Building ?

1492


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1695


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1386