what is the actual productivity of carpentor,fitter,masson
for brickwork and masson for plaster etc
Answer Posted / hari
1) 1m+1mh=10m2 blockwork per day
2)1m+1mh shuttering=around 5m2 per day
3)1m+1mh barbending=around 200kgs per day , inc cutting,bending,placing.
Is This Answer Correct ? | 11 Yes | 4 No |
Post New Answer View All Answers
what is the coefficient for running feet to cft coversion both area and price
What is construction mitigation management?
What out turn civil works
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Define angular dimension?
how to caluclate sienerge qty in construction in ap
Define What does civil status mean?
What is the cost difference between site mix and ready mix concrete per cubic meter
Define mirror?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how can calculate cutting length of diamond ring
What is unit weight of normal concrete?
What is Refuse Area In High Rise Building ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)