Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why the steam Turbines are Designed Higher side compare to Alternator

Answer Posted / powerplant.calculations

As there will be loss in power in Gear box

net power generated = Total power generated X Turbine Mech.eff X Gear box eff X Alternator efficiency..

For detailed information on power generation..
May refer
https://www.powerplantandcalculations.com/2020/05/pmg-excitation-avr-power-generation.html
https://www.powerplantandcalculations.com/2020/05/understanding-of-heat-rate-and.html

www.powerplantandcalculations.com

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3366


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2356


why airtel use + 24 volts and other operators use -48 volt

2563


operation

1826


explain how the third harmonic content of the magnetising current affects transformer design

3203


why do you consider yourself a suitable candidate for this position

7379


what is natural frequency of turbine shaft .

2222


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1688


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2409


How do you consider that you can improve and what assistance do you need to achieve this

1699


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3181


procedure of how to generate power in solar plant.

1895


What is LB-SR.

2949


LAPT working in alternator / generator

3554


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

941