Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is water consumption rate of water to condense one ton steam in condensor.

Answer Posted / powerplant.calculations

As a rule of thumb Around 65 MT of cooling water is required to condense the steam at rated vacuum.

Refer below link for more information
https://www.powerplantandcalculations.com/2020/05/steam-condenservacuum-and-calculations.html

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explain how the third harmonic content of the magnetising current affects transformer design

3333


procedure of how to generate power in solar plant.

2029


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1051


what does mean by kva rating

1572


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1754


can dp type level transmitter work in under vaccum condition

2029


what is the meaning of SST300 V56A in SIEMENS turbine

4412


what is the trip circuit supervision in an electrical meaning?

2232


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3472


what is restricted earth fault explain in details

2106


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2567


By any way can we increase the B check hours from 300 to 500

2257


How to calculate power press toneage

2131


what's the moog valve

1552


What is LB-SR.

3070