Answer Posted / nizamali.ali@gmail.com
It is top layer in cc road , full form is pavement quality concrete. generally design mix is M 40
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
what is the service corridor?
how gradation of aggregates effect on slump of fresh concrete?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
what is tension column?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
What are advancements in civil engineering?
Explain what are the problems one might face while having a Cantilever balcony?
what is Brick crushing strength(PSI)?
types of survey and levelling instrument ?
how to calculate steel for slab or footings?