What kind of preventive maintenance are there for AC induction motor?

Answer Posted / sabareeswaran

first recivied line clearance permit, after the shutdown main power supply, motor clean, then body earth checking, remove the terminal box check the connection, and check proper gland, now on the main power, check full load current, any different sound, after cloesd the permit

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are safety measures in /control in diesal engine/ explain them?

1341


dear sir/madam i want to get some knowledge about RRB EXAMINATION(section engineer) 1- what is minimum cut off 2- wht portion is major portion . 3- can any body provide Sample paper. thanks & regards ashish

1892


What is difference between unity power factor wattmeter and upper power factor wattmeter? In short circuit test of transformer the wattmeter used is unity power factor type or upper power factor type wattmeter?

2279


What if the difference beween internal and exrteranal LBB?

1198


Can you explain about TEE protection scheme?

1748






what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing

2166


A car's starter motor draws a current of 100 A at 12,0 V when starting the engine. The mechanical power required to turn the engine is 960 W. At what rate is energy from the battery converted to non-mechanical forms of energy?

1610


In a voltage-controlled current source A A current booster is never used B The load is always floated C A stiff current source drives the load D The load current equals Isc

1414


What are root loci?

644


What is resonant frequency?

691


i am electrical and elctronics engg passed out in 2009 want to attend for reliance placements.plz send me apttitude ,technical and hr question answers to my mail plz. my mail id-kat.bindas@gmail.com

1549


How we can determine short circuiting current any plant and for example a plant which power generation is 415 volts and plant load is 500 kw.

1551


How can I known multiplying factor .without multiplying table

1344


how to calculate the fault in substation

1704


list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.

1547