Soaking a transformer before putting a load on it is Definitely old school. Transformer Mfg.'s recommended energizing with voltage even at 50% of rated Voltage @ 50/60 Hz for 24 hours .The 60 Hz allowed the oil to saturate all the paper insulation in the windings. With out doing this the paper would burn @ full load which really would de rate the Transformer & contaminate the oil.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
On what basis the the size of Lightning arrester for buildings are selected ?
if voltage bt phase & nutral is 38v in a panel board . whats the root cause.
How many wall/floor flange will i use in bus duct system if we have in our design a 35th floor building.
Describe Non I.S. Earth System and why is it used?
why h parameter are called as hybrid parameter?
PIU how does work?
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?
In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?
During regenerative breaking= A rotating magnetic field is reversed B slip is positive C torque is positive D slip is negative
whate is the meaning of balance/unbalance,in stabilizers type
what is transistors comprised of?
Can we test the alignment of End shield and stator of turbogenerator without rotor insertion? Also how to fix maintain the alignment at site installation?
what is model question rrb junior engineer electrical gr.II
why does make gain margin and phase margin on same plot.?
How can i calculate the Breaking capacity of molded case circuit breaker, is the breaking capacity of CB for Diesel generator shall be less than grid supply's breaker ?