Answer Posted / mukul shahi
Temporary Bench Mark
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how much to get of BRC lapping in full yield and half yield ?
The portion of a brick cut across the width is called?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
howto calculate the quantities of material used in fly ash brick after finding the volume??
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
wat would be the probable interview questions and GD topics for IOCL exam?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What is packing Factor ?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
acceptance criteria for concrete works
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Why Should Curing Not Be Done By Ponding And Polythene Sheets?