Answer Posted / mukul shahi
Temporary Bench Mark
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How much material will consume for following specification water tank (9*7.5*6 feet)?
Where is the worlds longest elevator and how long is it?
how much one carpenter can doing shuttering of slab in one day
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
Explain what is the difference between built area and super built up area?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
What is oneside mat. And explain
what are the proper pipes for salt water line
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
How we calculate the service time of buildings
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.