how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / er. tiwari karan
M25:: 1:1:2 Total parts is 4 Cement part is 1/4
Dry Volume of M25 is approx 1.57 times of total volume
Density of Cement is 1440
Cement Required for 1 cum =1/4X1.57X1440=565.2 approx cu. mtr.
for Bags (india cement bags) is of 50kg so 565.2 kg /50kg = 11.304 bags per cu. mtr.
So as with sand
dry volume if always 1.57 for required volume
and aggregate sole qty of aggregate if crushed to get 1 cu. mt we required 1.57 cu.mt
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Why you are leaving present job?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
in design case of structural member best suitrable percentage of steel limit is what
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
What is the significance of cost estimate knowledge for an architect?
what is the list of building construction equipment & teir output?
Discuss some applications of modular elasticity?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
What is the Null Point of chimney in Power Plant
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
Why is the statue of liberty made of copper?
What is the tensile strength of wood?
how to calculate load bearing column