what is the actual productivity of carpentor,fitter,masson
for brickwork and masson for plaster etc
Answer Posted / thiyaneshwaran shanmugam
1) 1 Carpenter + 1 Helper - 5.5 - 6.5 Sqm/Day
2) 1 Steel fitter + 1 Helper - 150 - 200 Kgs/Day (Cut, Bend, Placing)
3) 1 Maon + 1 Helper - 10 Sqm/Day (Blockwork)
4) 1 Mason + 1 Helper - 12 Sqm/Day(wall plastering)
5) 1 Mason + 1 Helper - 10 sqm/Day(Ceiling Plastering)
6) 1 Mason + 1 Helper - 8 Sqm/Day(External Plastering)
7) 1 Tiler + 1 Helper
12 Sqm/Day (Vitrified Tile)
10 Sqm/Day ( Ceramic floor Tile)
8 Sqm/Day ( Ceramic wall Tile)
Is This Answer Correct ? | 90 Yes | 3 No |
Post New Answer View All Answers
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
what is flexible and rigid footing?
How much time Required for PPR pipe network testing
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
density of crush sand & crush stone or grit powder
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
What is made from large rocks, which protects the base of cliffs?
What is kn measurement?
explain the advantages of total stasion
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What is meant by autocad?
What are wooden shingles?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
What do we mean by partial moment release ??
Rate analysis of 150mm, 100mm, & 230mm thk BBM work