what is the actual productivity of carpentor,fitter,masson
for brickwork and masson for plaster etc

Answer Posted / thiyaneshwaran shanmugam

1) 1 Carpenter + 1 Helper - 5.5 - 6.5 Sqm/Day
2) 1 Steel fitter + 1 Helper - 150 - 200 Kgs/Day (Cut, Bend, Placing)
3) 1 Maon + 1 Helper - 10 Sqm/Day (Blockwork)
4) 1 Mason + 1 Helper - 12 Sqm/Day(wall plastering)
5) 1 Mason + 1 Helper - 10 sqm/Day(Ceiling Plastering)
6) 1 Mason + 1 Helper - 8 Sqm/Day(External Plastering)
7) 1 Tiler + 1 Helper
12 Sqm/Day (Vitrified Tile)
10 Sqm/Day ( Ceramic floor Tile)
8 Sqm/Day ( Ceramic wall Tile)

Is This Answer Correct ?    90 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1424


what is flexible and rigid footing?

1849


How much time Required for PPR pipe network testing

1691


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

1765


density of crush sand & crush stone or grit powder

6302






how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches

1220


What is made from large rocks, which protects the base of cliffs?

743


What is kn measurement?

738


explain the advantages of total stasion

1677


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

1523


What is meant by autocad?

661


What are wooden shingles?

802


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2123


What do we mean by partial moment release ??

3363


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

7881