1) 1 Carpenter + 1 Helper - 5.5 - 6.5 Sqm/Day
2) 1 Steel fitter + 1 Helper - 150 - 200 Kgs/Day (Cut, Bend, Placing)
3) 1 Maon + 1 Helper - 10 Sqm/Day (Blockwork)
4) 1 Mason + 1 Helper - 12 Sqm/Day(wall plastering)
5) 1 Mason + 1 Helper - 10 sqm/Day(Ceiling Plastering)
6) 1 Mason + 1 Helper - 8 Sqm/Day(External Plastering)
7) 1 Tiler + 1 Helper
12 Sqm/Day (Vitrified Tile)
10 Sqm/Day ( Ceramic floor Tile)
8 Sqm/Day ( Ceramic wall Tile)
| Is This Answer Correct ? | 105 Yes | 3 No |
Post New Answer View All Answers
How to calculate quantity of plum masonry in 1:3:7
What in bending moment, if a moment is free end of cantilever beam?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
How much cement will require for 1Rmt Skirting laying
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
How is make concrete cube?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
How many lbs are there in a yard?
60-70 grade of Bitumen is VG-30 ?
Which is the direction of negative angle?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
What is Grid floor and mention its advantages ?
How does siphoning work?