What is Refuse Area In High Rise Building ?
Scaffolding IS code NO.
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How to make a c++ program that converts any base to base 10?
List out some of the common problems that architect have to tackle it?
In case if concrete box girder bridges how is the number of cells determined?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
WHAT DLC DESIGN IN CONSTRUCTION
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
how to conversation of all construction material in to brass
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
how to take concrete quantity for precast segment for viaduct project?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???