Tell the least count of a prismatic compass , surveyor compass , Theodolite & how we can determine it ?
Answer Posted / mandeep gupta
15' surveyer compass
15' prismatic compass
20" Theodolite
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
How to calculate the crank rod in slab
how to convert sand in Cft to Kgs
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
how many cement used in single story residential building per sqft
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
I am called for interview from north east power plant .so, I need some interview question which may help me.
why we use aggregate,sand with cement in concrete?
What goals do you have in your career?
Explain moment of inertia and its importance.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
How much quantity water should be placed in one cubic meter area?