Answer Posted / karnam seenu
Bar bending schedule can be prepared to find total consumption of steel for particular member diameter wise as per the spacing between bars & dia of reinforcement mentioned in the GFC drawings. Simple formula to find the same is Number of rodsxlength of each road x Unit weight of particular diameter of reinforcement = Weight of reinforcement in KN or kgs.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
What is the difference between chamfer and fillet?
Wat is meant by Aecron brick?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
Why the statue of liberty is made of copper?
how to calculate mivan shuttering matrial
crank types
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
How do you compute volume of airflow?
How we calculate the service time of buildings
difference between trapezoidal and pedestal footing and how the load acts on that
what is the mix design for M:60 with micro silica andmetakaoline?
What is the difference between tor steel and tmt steel?