when we have to use UPF wattmeter and LPF wattmeter?
what is the difference between UPF and LPF wattmeter in
terms of construction?
Answer Posted / k .balaji singh
As we know the difference between upf and lpf as for resistive loads we use upf as resistive loads are which rise in temperature while passing current in electrical and in mechanical the break drum is a resistive load so while coming to inductive load which we use lpf low power factor wattemeter as inductive loads as inductor which does not draw that much current comare to resistor.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to protect a Dosing pumps/any sensitive equipment (single phase) from surge protection inside a food factory.
comparision between ACB and VCB
What is the selection process of breakers. Can any one please give a formulation on same?
What is acsr cable and where we use it?
Y phase plates are used in transmission line??? what is there need???
what is acceptable leakage current for 33kv cable while doing high voltage test for cable? how to calaulate the leakage current for 33kv or any rated cable?
What conditions are required for transformer to operate at low frequencies ?
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?
what is a reactive power? what is the relation with power factor?
Direction of flow of active power and reactive power with logic?
what is DRP panels?
There are a trformer and an induction machine. Those two have the same supply. For which device the load current will be maximum? And why?
Why we are using Isolation Power Transformer inplace of commercial power transformer? What's the difference between them?
which motor have relatively high power factor and what is reason for have high pf? 1.capacitor run motor 2.shaded pole motor 3.capacitor start motor 4.split phase motor
hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.