Brick size 230X115X150mm, how many bricks, quantity of sand,
cement required to construct 10 sq mtrs of 115mm thick brick
wall.
Answer Posted / nirmala
earthwork excavation by manual means for foundation of buildings,culverts,water supply and sanitary lines and electrical conduits etc.either in pits or in trenches, in ordinary soil including dressing the bottom and sides of pits and trenches,stacking the excavated soil clear from edges of excavation with lead up to 50m,including breaking of clods complete as per specification ,including pumping of water,including cost of all labour,material,transport,hom of machineries,all lifts,loding and unloding .specification no KBS 2.1(a)/2.3.5.work to be completed as per the directions of the engineer in charge.
UNIT QUANTITY RATE(IN RS) AMOUNT(IN RS)
Cum 230 204 46920
please tell me the how its came quantity
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the ffactors you considered choosing the course?
For what building Built-on balconies are preferable? What are the advantages?
Define What is the meaning of a blue land surveyors flag?
wat would be the probable interview questions and GD topics for IOCL exam?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
How do you compute the volume of airflow?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
which red: used in roof teping, then use only cement
Is there any course for billing available in Mumbai? If yes then please mail me the details..
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
What goals do you have in your career?
How much material will consume for following specification water tank (9*7.5*6 feet)?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement