How to obtain B license from TNEB license board. What is eligibility?
Answer Posted / s purusothaman
Sir 6 month force b licence
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
rajha power sector details
EXPLAIN WHY THE SURGE CURRENT RATING OF AN MCCB OR CIRCUIT BREAKER DECREASES WITH INCREASE IN THE RATING OF MCCB OR CIRCUIT BREAKER.
How to design a Unit auxiliary transformer for a power house having a unit of 65 MW and Generating voltage of 11 KV and Secondary voltage of 433V
why the rotor current becomes in steady state during high slip region? please verify with equations.
What is open loop and control loop systems?
How to setting the volume of RTCC panel AVR (11kv) controller
what is induction furnance? how many phase supply given io its coil for 15 or 20 ton furnance?
aternator every parts and its working
1 Ton is equal to how many watts?
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
Define delay time.
What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?
what is the current density of copper & alluminium.
WHICH SIZE A.B.CABLE IS USED FOR 11KV.
Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??