Answer Posted / amit sarkar
NOS
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to stop beam concrete between column
Slump Values for works?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is the primary difference between adsorption and absorption?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
What black man invented the clothes dryer?
how to do sudoko puzaals?
natucher of concrete &type of concrete?
What Are The Steps Involved In The Concreting Process, Explain?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
What is structural frames or systems?
Stringer How many cm goes to landind
What is the use of water table & Kreb stone for drain
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????