Hi,
I don't know exactly when System Testplan should be
prepared 1)while analysing BRS or 2) analysing FRS or 3)
after analysing the Requirement Specification
Answer Posted / venmathi
System Test plan should be prepared from Software/Functional requirement document. This is according to the V&V Model.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the role of quality assurance in a product development lifecycle?
I need to learn everything I can about Function, Non-Functional and Regression Testing. What is the best online resource?
Explain what n+1 testing is?
What is flowchart?
What is Functional, Non-Functional, and Regression used for (i.e. the purpose of each)?
WHAT ARE THE VARIOUS RISKS INVOLVE IN TESTING?
What is 'test plan driven' or 'key word driven' method of testing?
What is the difference between testing techniques and testing tools?
What is memory leaks and buffer overflows ?
What is software fault?
What is the smallest unit of information transfer in FC?
What is compliance testing ?
Every One is saying that Documentation is very very importent in Tester's Life.Could any one explain with proper examples..?
give an example of unit test and integration test and system test and UAT test?
Explain glossary of software qa/testing?