How to obtain B license from TNEB license board. What is eligibility?

Answer Posted / rajesh

B exam pass next?

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How calculated single phase induction motor req. Capacitor?

1118


How much load can be taken for chiller from 1500 kva transformer

861


What is the limitation of kirchoffs law?

648


If 22 KV HT line, Current transformer is 25/5 then how to calculate multiplying factor.

609


why +24 v and -48 v give to BTS? If -48v protect from surge then why we not use -24 v?

1420






electromechanical relay type identification example : type=tjmh t-stants for j- m- h-

1948


Hi Suppose we have a wye/wye transformer which is grounded at both sides,in this situation, do we have ay ground transformer? in other words, ground transformer can do any thing more (while we have nuetral wire in both sides)? As the last question, what about 3rd harmonic? we have two choices: first using wye/delta transformer + ground transformer and second using wye/wye earthed connection.in the former choice, we dont have 3rd harmoonic at the secondary side but what about Yn/yn conection? do we suffer from 3rd harmonic in the Yn/yn connection?

1523


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1495


Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA

1403


how to build a network which step down 415v to 1v rms

1462


what is the cause of voltage dipp or swell in the transmission lines?

1611


When steam condenses and becomes water at the same temperature, the specific heat for the process in kJ/kg k is

652


what happen ehen synchronisation is done at below rated speed

1611


why and where we use early make & late break contacts in protection?

7610


given data are load current & power factor cable core size? plz any one update the calculation formula

1388