Percentage of wastage of cement ? Please mention IS code and clause from where I get it.
Answer Posted / hanamareddy maddur
2% of wastage consider in cement
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what motivates you to do a good job
How is the leaning tower of pisa supported?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
What are the RISKS during the project construction?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
what are the Task work of different labour.?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
Rate analysis of Vitrified tile in cement mortor 1:3
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
Soil bearing capacity formula
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
What is Grid floor and mention its advantages ?
what is the theoritical percentage of concrete cubes testing per day?
What is the minimum size of the particles of silt soil?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?