Answer Posted / khursheed
PCC is done
1-To provide a plain surface as foundation bed
2- To provide a barrier between the soil & concrete
3-To provide to distribute the foundation load uniformly to soil up to some extent.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
Dear Sir What is the Contraction joint for base Slab
Why should you consider yourself fit to be hired by jindal steel.
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
What is the strongest bridge for a school contest?
what are the duties of Site Engineer in work site?
How to activate isometric axes in cad?
Difference between lime, distemper and plastic emulsion?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
what is the anchorage length of reinforcement.
what is Bearing Capacity,How to determine it?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
Explain the difference between shear and tensile strength.
RR masonry rate analysis