Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
Answer Posted / remesh babu pillai .k .p
cost Rs .3000
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is the difference between Fe 500, Fe 500 D and Fe 515.
Technical Question of Civil Engineering
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
cause of cylinder test failure
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
what is the water cement ratio for plastering
How you can use different dimension tools in cad? What are the different dimensions available?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
silt%= silt volume/ silt+sand volume is this right?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.