the plan area of a building 10*15 of superstructure 0.30 then plinth area is
Answer Posted / titu
157.79m2
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
afe or not
Define What materials were used to build the Golden Gate Bridge?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is the crank length in the slab?
how to nfind out the specific gravity of sand.aggregate,water please help...
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
how do we design mix ratio?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Can we use concrete of slump cone in cube casting in which we have already measured slump?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
how many shuttering material required for 1000 sq.m built up area.
i need gate exam civil engineering question papers with answers
What is the difference between engineering stress and true stress?
Civil engineering material testing Standard results
Dear Sir What is the Contraction joint for base Slab