What is difference between 3 point and 4 point starter
Answer Posted / udit
3pt starter : No volt coil and field coil are in series .
4 pt starter : No volt coil and field coil are in parallel.
To get speed above rated speed we use field weakening control as speed increases if we reduce flux. So to do it we reduce field current . In 3pt nvc and field are in series so nvc current also reduces hence the electromagnetic force reduces and magnet releases the handle and motor gets turned off. Thus we cannot use 3 pt starter for field weakening control hence we use 4 pt starter .
If there is field failure (field coil open circuited)then speed becomes dangerously high and motor can damage. To avoid this if field C oil is in series with nvc then whenever there is field failure the current in nvc also becomes zero and motor is turned off .hence no damage to motor. This is advantage of 3pt over 4pt.
Nvc is no volt coil
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
What is the difference between electronic regulator and ordinary rheostat regulator for fans?
EHV current carrying parts need to have smooth finish,then how can a 245kv GIS with emery finish can run so long?
1.what is mean by 8/20 micro sec waveshape
Could you measure voltage in series?
How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer
Wt is the function of reactive power? How it generates & consume though resultant is zero?
WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?
Define corner frequency?
LET ME NOW MORE ABOUT icu and ics for circuit breaker. how we calculate the rating of circuit breaker and i c u and ics values
When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
What technology is used in latest generators?
what is the effect of earth on capacitance in 3-phase and 1- phase transmission line?
I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting