is plate load test can be done on cohesive soils for immediate settlements ?
Answer Posted / rajasekar
Ans is yes, Because cohesive soil commonly has less density. So we should do plate load test before Start the high-rise building.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
What do you mean by bond? What are the different types of bonds?
what is the use of water bar in water tank and is this an extra item in estimate?
How do you convert wind speed into force?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Why is the statue of liberty made of copper?
strength vs shape factor
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
What is Base Shear ?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what is concrete canvas?
pls tell me about method of cutting length of ties column
give me the rate analysis for Bituminous Macadam and SDBC
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?