Why attempration spray is used after hp heater?
Answer Posted / velmurugan
As we all know that the attemperator main purpose is to reduce the temperature of superheater steam..If we take water after feed pump or LP heater its temperature is slightly lower than the hp heater ,so there is a possibility of superheated steam condense in an attemperator itself by using lp heater or feed pump water..
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
procedure of how to generate power in solar plant.
How do you consider that you can improve and what assistance do you need to achieve this
what is the trip circuit supervision in an electrical meaning?
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
what does mean by kva rating
can dp type level transmitter work in under vaccum condition
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is restricted earth fault explain in details
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
Why superheated are started before I'd and rd fan?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
By any way can we increase the B check hours from 300 to 500
How We Calibrate the vaccum transmitter?
what's the moog valve