A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx
Answer Posted / pritamdebnath
Here , the cost will be charged on the basis of per ft square . Total area covered 40 × 12 = 480 .
As per ft required cost is 100 ,hence for 480 square ft ,total labour costs will be 480 × 100 = 48000 rs
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Why are the bolts that hold steel rails together in oval holes?
Explain different types of rcc pipes.
What are the causes of building collapse?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Mention different types of roof systems?
what is m30 in concrete tiles
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
How to find permissible diagonal tensile stress in reinforced brick work
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
What is horizon or horizontal mining?
How many litres of water used for curing of 1000sqft of slav
How many pyramid in egypt?
During reclamation how can the occurrence of mud waves can be rectified?