i m a btech 1st year student of civil branch.
i want to do mba in future after having some work experience
in civil field.is there any mba course made exclusively for
civil engineers?
Answer Posted / raju goyal
You can join executive course which is basically MBA program in project management and CTM from Nicmarc pune and delhi
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
Which is the most prominent tower of world?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
What is an ice dam sock?
what is work of planning deptt. in any construction compny (in road project)
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Spider cracks occur in beam bottom due to––
what is concrete canvas?
What will you do if a portion of load bearing wall collapses under your supervision?
what are the changes in concrete pour height as per IS 456, 2009?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
What is the minimum size of the particles of silt soil?
What is need for setting limits?
What is Joule Brayton Cycle?