Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?

Answer Posted / er. amit sagar

Only for ring calculation-

Column size 300×300, 8mm dia of bar
Cover 40mm, 2×40 =80 mm
Total length= 4×(300-80)= 880 mm
2 nos. Hook= 2×(10d)=2×10×8=160mm
5 nos. Bend= 5×(2d) , for 90 degree
= 5×2×8
= 80 mm (deduction)

Total cutting length= total length+hook length-deduction
=880+160-80
=960 mm ( for 1 nos. ring length)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How foundation is designed, Column design and beam design

2376


I need to constructive work in amaraj batteries

1911


what is total volume of ingredients used in concrete accordingly

2292


Which ratio use for cement selery???

2002


How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?

8062


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

2056


The portion of a brick cut across the width is called?

1628


1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

2095


for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

2245


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2323


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

2158


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

18326


what is the design procedure for building

2363


material used for mendrel use to bend epoxy coated rebar

2223


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem